Completed Core Rapid Protocol CAPE-2 Frame

Rizwan Merchant   January 30, 2012   Comments Off on Completed Core Rapid Protocol CAPE-2 Frame

Recently the Integration Team completed a frame of the CAPE-2 Core design. Attached are photos of the boards soldered on to the frame.

 

– Alex Wehmann soldering the connectors for the backplane, after having tacked the corner pins in place to ensure proper orientation.

– Checking alignment with all the boards and the prototype battery holder after installing them in the prototype frame.

Login